NexusFi: Find Your Edge


Home Menu

 





Running 2 s back testing simulating optimization strategies and the same time


Discussion in TradeStation

Updated
    1. trending_up 1,816 views
    2. thumb_up 0 thanks given
    3. group 1 followers
    1. forum 0 posts
    2. attach_file 0 attachments




 
Search this Thread

Running 2 s back testing simulating optimization strategies and the same time

  #1 (permalink)
fractal
Jerusalem, Israel
 
Posts: 4 since Mar 2012
Thanks Given: 1
Thanks Received: 0

How can I Run 2 s back testing optimization of simulate strategies and at the same time?

I tried to use 2 different workspaces, for running 2 different optimization strategies, on 2 different symbol charts, but one stuck the other

Reply With Quote




Last Updated on March 8, 2012


© 2024 NexusFi™, s.a., All Rights Reserved.
Av Ricardo J. Alfaro, Century Tower, Panama City, Panama, Ph: +507 833-9432 (Panama and Intl), +1 888-312-3001 (USA and Canada)
All information is for educational use only and is not investment advice. There is a substantial risk of loss in trading commodity futures, stocks, options and foreign exchange products. Past performance is not indicative of future results.
About Us - Contact Us - Site Rules, Acceptable Use, and Terms and Conditions - Privacy Policy - Downloads - Top
no new posts